    FAQ SUE n. 24

    LR 38/2015 has been in force since 27.11.15, it is possible to self-subject to the same only in case of presentation of an essential variant; in this case it will be necessary to update the energy project with the calculation procedure and all the energy regulations in force at the time of submission of the[...]

  • Informative content

    FAQ SUE n. 23

    It is necessary to demonstrate the requirements dictated by the decree by attaching the consumption for heating, cooling and the production of domestic hot water, in addition to the calculation of the renewable quota produced by each renewable source system envisaged in the project, detailing the contribution for[. ..]

  • Informative content

    FAQ SUE n. 22

    As part of the calculation procedure referred to in DDUO 6480/16 and subsequent amendments, it is always possible to self-submit to the calculation of the discount through the charges discount curve, updated with resolution 221/17, by submitting a declaration, signed by the property, of the will to self-subjugation. In this case[...]

  • Informative content

    FAQ SUE n. 21

    In the event that the discount request is guaranteed by the specific guarantee, the same remains valid even in the presence of essential variations that occurred after the entry into force of LR 18/2019; for practices whose original title was presented subsequently, the benefits of [...]

  • Informative content

    FAQ SUE n. 19

    Once it has been verified that it does not fall within the case of superelevation and that the rigidity of the attic floor is not modified, the execution of the interventions can lead to the following cases: No increase in loads: the intervention can be classified as a local intervention; Load increase less than 1[...]

  • Informative content

    FAQ SUE n. 18

    As indicated in par. 2.4.1 of the 2018 NTC, seismic checks of temporary and provisional works or those under construction may be omitted when the project envisages that this condition will remain for less than 2 years. For this reason it is not necessary to carry out a seismic deposit. It is noted[...]

  • Informative content

    FAQ SUE n. 17

    Please remember what paragraph 8.2 of the 2018 NTC states: "In the case of interventions that do not involve structural changes (systems, distribution of spaces, etc.) the designer must evaluate their possible interaction with the ULS and SLE of the structure or part of it.” It will therefore be the prof[...]

  • Informative content

    FAQ SUE n. 16

    In the event that there is a change of intended use, it is necessary to refer to paragraph 8.3 of the NTC2018 which states: "Existing buildings must be subjected to safety assessment when even just one of the following situations occurs: omissis - change of intended use use of the co[...]

  • Informative content

    FAQ SUE n. 15

    In the event that the intervention does not affect the pressure bulb of the walls, it is not necessary to file and/or report pursuant to art. 65. In the event that for the execution of the same it is necessary to carry out excavations lower than the tax quota of the foundations, the professional will have to take action based on[...]

  • Informative content

    FAQ SUE n. 14

    In Annex A of Presidential Decree 642 of 26 October 1972 art. 3 paragraph 1 indicates that the €16 revenue stamp is required for "Extraordinary appeals to the President of the Republic. Requests, petitions, appeals and related briefs addressed to the offices and bodies, including collegiate ones, of the State Administration,[. ..]