FAQ SUE - Category: Conformation and equipment of buildings - Connections to sewerage and drains
List of SUE FAQs relating to the category "Conformation and equipment of buildings - Connections to sewerage and drains"
By clicking on the question you will find the answer.
-
Do buildings located in private streets have to be connected to the municipal sewer system? -
The building located inside a courtyard has a sewerage system connected to the building on the street. Is it legal? Instead of a shed located inside a courtyard area I want to build a new building. Do I have to connect myself or can I download into the network of the building located facing the street? -
I have drains below the road surface and above the connection exit level. Don't I have to do anything? The courtyard/basement where there are drains feeds directly into the sewer which runs at a lower level, is this correct? -
How should the waste be introduced into the municipal sewer system? -
When are the checks carried out? I already have the eligibility so am I in order? -
Should the Imhoff, Caser or purification facilities be eliminated? -
Which wastewater should I discharge into the sewer? -
What sanctions are incurred for failure to comply with the law? -
What regulations must be respected for discharging domestic wastewater into the sewer? -
Following the modification of the internal sewerage network of a pre-existing building or the construction of a new building, is it always necessary to obtain prior authorization for discharge from the Office?
Subjects:
Updated: 12/10/2021