Following the modification of the internal sewerage network of a pre-existing building or the construction of a new building, is it always necessary to obtain prior authorization for discharge from the Office?

Yes.
All discharges must be authorized. For existing buildings, the relevant authorizations issued at the time (for entry into sewers, drains, waterways or into the ground) refer to the consistency to which the authorization itself refers.

The building permit for the execution of the works, whether certified or explicit, refers to the masonry works (excavations and laying of pipes) does not include authorizations for the discharge and use of the same when they are located below road level . For example, discharge into the sewer is always permitted (for domestic waste water) as long as the regulations issued by the local authority and the manager of the Integrated Water Service (now Metropolitana Milanese SPA) are observed. Furthermore, the connection to public receptor bodies (sewerage, manhole, manhole ditch) are carried out by the manager of the same and therefore both due to their position and their construction they cannot be self-certified. Furthermore, as per regulations, there may be limitations on discharge both in terms of quantity and quality of waste discharged or to be discharged.

FAQ SUE n. 83 - Published on October 12, 2021

Updated: 12/10/2021