Topic: Construction and territory

Search topics

Filter by type

List of results

  • Informative content

    FAQ SUE n. 3

    The art. 67 of Presidential Decree 380/2001 was modified by Legislative Decree 222/2016 with a new draft of paragraph 8. The new text is reported: “8. The certified report is accompanied by a copy of the testing certificate. 8-bis. For repairs and local interventions on buildings there is[...]

  • Informative content

    FAQ SUE n. 2

    On the first page of model 2 of the regional forms, there is the possibility of choosing whether the seismic deposit also has the value of reporting pursuant to art. 65 of Presidential Decree 380/2001 (known as the "reinforced concrete warehouse"). The deposit pursuant to art. 65 must be carried out by the executing company and must[...]

  • Informative content

    FAQ SUE n. 1

    It is possible only by not ticking the box on the first page of form 2, which states "this communication/request is also valid pursuant to art. 65 of Presidential Decree 380/2001". In this case, please remember that before starting the structural works covered by the deposit it will be necessary to inte[...]

  • Informative content

    Environmental Sustainability and Urban Resilience

    The following section publishes the Technical Document for the implementation of the regulations referred to in Art. 10 "Environmental sustainability and urban resilience" of the Implementation Rules of the PGT Rules Plan, containing the calculation methodology for the minimization of carbon emissions and for the[...]

  • Informative content

    PGT approved and in force - Milan 2030

    The Municipal Council, on 14/10/2019, approved the Territorial Government Plan (PGT) composed of the new Plan Document, the variations of the Service Plan, including the Religious Equipment Plan, and the Rules Plan and accompanied by the new geological study. The Plan has become[...]

  • Service

    Certified Report for Usability - SCIA Usability

    Upon completion of the works, the Certified Viability Report or SCIA viability certifies the existence of the safety, hygiene, healthiness and energy saving conditions of the buildings and the systems installed in them, assessed in accordance with the provisions of current legislation, as well as the conformity of[.. .]

  • Informative content

    Measures of the Urban Regeneration Directorate

    The list of agreements stipulated within the Urban Regeneration Directorate - former Urban Planning Directorate (following organizational review from 6 February 2022) is available in the attachments section.

  • Service

    SPV – Early removal of conventional constraints on subsidized residential construction

    I vincoli convenzionali inerenti il prezzo massimo di cessione e i requisiti soggettivi degli assegnatari delle unità abitative, e loro pertinenze, possono essere rimossi anticipatamente la scadenza della Convenzione, se rientranti nelle categorie sotto specificate e previo pagamento di un corrispettivo e su[...]

  • Service

    CSP - Request for transformation into full ownership of properties built on areas ceded by the Municipality under surface rights

    Riapertura della procedura per la trasformazione del diritto di superficie in proprietà degli alloggi realizzati in edilizia convenzionata (comparti PEEP), strumenti urbanistici disciplinati dalla legge 167/1962 e ss.mm.ii. nonché dall'art. 31 della legge 448/1998 e ss.mm.ii., come modificato dall'art. 22 L.[...]

  • Informative content

    Enhancements of affiliated residential buildings (CSP – SPV – RPV)

    Procedure riservate a specifiche categorie di immobili residenziali realizzati in regime di edilizia convenzionata con il Comune di Milano che riguardano: Richiesta di trasformazione in piena proprietà di immobili realizzati su aree cedute dal Comune in diritto di superficie (CSP) Richiesta di determinazione[...]

No results