PII MIND Expo Area Approval

PII MIND (Expo Area) – Approval – Attachments to the resolution of G.C. n. 129 of 31 January 2020

THE MUNICIPALITY OF MILAN
URBAN PLANNING MANAGEMENT
THEMATIC PLANNING AREA AND AREAS ENHANCEMENT

OBJECT

APPROVAL OF THE INTEGRATED INTERVENTION PROGRAM MIND - MILAN INNOVATION DISTRICT - CONCERNING THE AREA USED FOR THE 2015 UNIVERSAL EXHIBITION

- - - - -

for THE AREA DIRECTOR
THEMATIC PLANNING AND AREAS ENHANCEMENT
Arch. Giancarlo Tancredi

THE VICE DIRECTOR
URBAN PLANNING MANAGEMENT
Arch. Giovanni Oggioni

Attachments
List of project documents
1. STATE OF FACTS

TAV 1.01 Territorial framework

TAV 1.02.01 Urban planning framework (- Expo Program Agreement, Supplementary Deed to the Expo Program Agreement, Supplementary Deed to the Fair Program Agreement)

TAV 1.02.02 Urban planning framework. Current Government Plan for the Municipality of Milan 

TAV 1.02.02.A Urban planning framework. Municipality of Milan Territorial Government Plan adopted 

TAV 1.02.03 Urban planning framework. Territorial Government Plan Municipality of Rho (2013) 

TAV 1.03 Existing Mobility Framework 

TAV 1.04 Cadastral plan (2019) 

DOC 1.04.A List of maps 

TAV 1.05 State of the Intervention Area 

TAV 1.06 Constraints, easements and buffer zones 

TAV 1.07 Consistencies of the area (buildings, naturalistic...) 

TAV 1.08 Subservices (with attachments) 

DOC 1.A Photographic documentation

TAV 1.A.01 Plan of the photographic survey 

TAV 1.09.01 General survey of the area 

TAV 1.09.02 General survey of the area 

TAV 1.09.03 General survey of the area

2. PROJECT STATUS

DOC 2.A Technical Explanatory Report

TAV 2.01 Project scheme (planivolumetric) 

TAV 2.01.A Project scheme - Characterizing elements 

TAV 2.01.B Project outline - Functional Excerpts 

TAV 2.01.C Project outline - Guidelines (Plan, volumetric, typological, formal and construction provisions)

DOC 2.01.A Guidelines sheets

TAV 2.01.D Project scheme – Planivolumetric Scenario

TAV 2.02 Relevant Functional Excerpts Sheets

TAV 2.03 Land Regime – Private Areas, Transfers, Easements 

TAV 2.04 Funds due 

TAV 2.05 Theme Park 

TAV 2.B.01 Project Mobility Framework

TAV 2.B.02 Project road layout and parking system 

TAV 2.B.03 Mobility System

TAV 2.B.04 Identification of the safeguard zones of the A52 node. Feedback from the observation of Milan Serravalle – Milan Ring Roads

TAV 2.C.01 Project subservices
 

3. LANDSCAPE AND THEME PARK 

DOC 3.B Explanatory report Theme Park

DOC 3.C Green - Blue Park

TAV 3.01 Representation of open spaces, parks and squares 

TAV 3.03 Example sections

4. PRIMARY AND SECONDARY URBANIZATION WORKS

DOC 4.A Illustrative report on primary and secondary urbanization works

DOC 4.A.01 Report estimating the value of the artefacts constituting the Cascina Triulza complex

DOC 4.B Descriptive report on existing primary and secondary urbanization works

DOC 4.C Economic framework summarizing the values ​​of existing primary and secondary urbanization works

DOC 4.D Feasibility study of the adaptations of existing primary and secondary urbanization works

TAV B.1.2 Adaptation of the East Gate -

TAV B.1.4.1 North Loop Adaptation - 1 

TAV B.1.4.2 North Loop Adaptation - 2 

TAV B.1.4.3 North Loop Adaptation - 3 

TAV B.1.5 Adaptation of the Roserio car park 

TAV B.1.6 Cargo Reconfiguration 11

TAV B.1.7 Adaptation of the West Gate 

TAV B.1.8 New roundabout in the Bollate prison area 

TAV B.1.10 ALS1 Adaptation of the “South 1” perimeter road and former temporary Post Office axis

TAV B.1.10 ALS2 Adaptation of southern perimeter roads - Southern section of ALS2

TAV B.1.10 ALS3(A) Adaptation of SOUTH perimeter roads - Southern section ALS3A

TAV B.1.10 ALS3(B) Adaptation of SOUTHERN perimeter roads - Southern section ALS3B

TAV B.4.1 Adaptation of the MIR Mind - Fiera walkway (Ex PEF) Section B

TAV B.4.2 Adaptation of the MIC MIND-Cascina Merlata walkway (formerly PEM)

TAV B.4.3 Rho-Mind-Sport Park - Leisure connection

TAV B.4.5 Adaptation of western access to underground level access to the RFI station

TAV B.4.7 Redevelopment of the Lungocanale route

TAV B.4.8 New Food and Health Park

TAV B.4.9 New Sports and Entertainment Park

TAV B.4.10 Works related to the MIND-Stephenson railway stop Accessibility works for the new station

TAV B 4.11 Interventions to enhance accessibility and mobility in Rho

DOC 4.D.01 Economic framework summarizing the values ​​of the works to upgrade the primary and secondary OOUU

TAV 4.01 Existing primary and secondary urbanization works 

TAV 4.02 Adaptations of existing primary and secondary urbanization works

TAV 4.03 Phasing of the transfers of urbanization works

5. ECONOMIC REPORT AND COMPUTATION ON THE FEASIBILITY OF THE PROGRAM

DOC 5.A Summary economic framework

DOC 5.B Temporal program of the Works

6. RULES AND TOOLS FOR IMPLEMENTATION

DOC 6.A Technical Implementation Standards

TAV 6.A.01 Functional Excerpt Project Model

TAV 6.A.02 Survey Table Model

TAV 6.A.03 Survey Table Template - Indicators

DOC 6.B Agreement Scheme

STRATEGIC ENVIRONMENTAL ASSESSMENT PROCEDURE:

Environmental Report

Non-Technical Summary

Annex 1 – Current programmatic tools 

Annex 2 – Resilience: proposal of indicators 

Annex 3 – Documentation of predictive evaluation of acoustic climate and study of the necessary mitigation systems 

Annex 4 – Mobility Plan 

Annex 5 – Energy strategy 

Annex 6 – Verification and adaptation of service infrastructure works – hydraulic invariance 

Annex 7 – Landscape report 

Attachment 8 - Atmospheric modeling study and related tables 

Annex 9 – Study of territorial potential 

Annex 10 – Study of connections with the context 

Attachment 11 – Diagram of the temporal phases of the development project 

Annex 12 - Health risk assessment for vapors coming from the groundwater and data

Table 3 – Constraints, easements and buffer zones

Table 4 – Location of drinking water wells around the Site

Table 5 – Location of companies at risk of major accidents (RIR), contaminated sites and unhealthy industries

Final Reasoned Opinion 

Final Summary Statement

Published on: 06/02/2020