PA7 (TROTTO) - Notice of making available the proposed Implementation Plan, the Environmental Report and the non-technical Summary as part of the Strategic Environmental Assessment (SEA) procedure
PA7 (TROTTO) - Notice of making available the proposed Implementation Plan, the Environmental Report and the non-technical Summary as part of the Strategic Environmental Assessment (SEA) procedure
Seen:
- the art. 4 of Regional Law n. 12 of 11 March 2005 'Law for the governance of the territory';
- the art. 14, of legislative decree n. 152 of 3 April 2006 'Regulations on environmental matters';
- the general guidelines for environmental assessment (SEA) approved with decree 351 of 13 March 2007, and the further regulatory requirements approved by the Regional Council with resolution no. 761 of 10 November 2010;
it is known that
- the following documentation is available to the public from 13 May 2022 until 27 June 2022:
ENVIRONMENTAL REPORT AND ATTACHMENTS
Processing no. Published file title
9 Environmental Report
9.02B Non-Technical Summary RA
9.02C Annex E_Form V.INC.A
9.03 Preliminary study hydraulic invariance
9.04 Acoustic report
9.05 Traffic study
9.07 Energy analysis
9.07B Art. 10 PGT
IMPLEMENTATION PLAN DEVELOPED
Processing no. Published file title
1A.01 PGT classification
1A.02 Orthophoto classification
2A.01 CT and Land Registry classification
2B.02 Current status - Statements and profiles
2B.02B State of affairs - Sections
2D.01 Chorography
2D.02 SF - Road network plan
2D.03 SF - Road sections
2E.01 Green survey report
2E.02 Survey of greenery
4A.01 Planivolumetric on aerial photo
4A.05 Project - Sections
4A.07 Renderings
4B.02 Prescriptive plan
5V.01 Road project plan
5V.08 Road project report
5S.01 B Sewer plan
5S.02.B White water network plan
5S.03.B Aqueduct plan
5S.04.B Electrical network plan
5S.05.B Telecommunications network
5S.06.B District heating network
5S.07.B Public lighting
5S.08.B Synoptic plan of underground services
5S.09 Road sections
5S.11 Subservice report
5P.03 Green general preliminary
5P.11 Green project report
6 Urban planning technical report
- the same documentation is published on the regional SIVAS website and, in paper version, is deposited at the following locations:
- Municipal offices of the Implementation Planning Area 1 - via Sile, 8 - 7th floor - 'Proceeding Authority' with the following opening hours: Monday to Friday from 10.00 to 12.00 and from 14.30 to 16.00;
- Municipal offices of the Water Resources and Environmental Hygiene Area – via Sile- 8 – 3rd floor – 'Competent Authority' with the following opening hours: Monday to Friday from 10.00 to 12.00 and from 14.30 to 16.00.
Anyone who has an interest, pursuant to art. 14 paragraph 2, of Legislative Decree 152/06 and subsequent amendments, also for the protection of widespread interests, may inspect of the documentation made available and present observations and proposals in written form, also providing new or additional cognitive and evaluative elements, presenting them by June 27 2022 to the following email addresses:
planningurbanisticattuativastrategica@postacert.comune.milano.it
urb.atpa2@comune.milano.it
The Area Director
Arch. Sara Augusta Morlacchi
“Proceeding Authority”
Attachments
PA documents
- 1A.01_PGT classification (pdf - 37007.382 KB)
- 1A.02_Orthophoto classification (pdf - 4423.117 KB)
- 2A.01_CT and Land Registry classification (pdf - 2977.452 KB)
- 2B.02_State of affairs - Statements and profiles (pdf - 1234.141 KB)
- 2B.02B_State of affairs - Sections (pdf - 1479.391 KB)
- 2D.01_Chorography (pdf - 3403.507 KB)
- 2D.02_SF - Road network plan (pdf - 1454.521 KB)
- 2D.03_SF - Road sections (pdf - 1335.029 KB)
- 2E.01_Green survey report (pdf - 27106.91 KB)
- 2E.02_Relief of greenery (pdf - 1665.763 KB)
- 4A.01_Planivolumetric on aerial photo (pdf - 1863.956 KB)
- 4A.05_Project - Sections (pdf - 4490.348 KB)
- 4A.07_Rendering (pdf - 7771.45 KB)
- 4B.02_Prescriptive plan (pdf - 1830.362 KB)
- 5P.03_General green plan (pdf - 3887.817 KB)
- 5P.11_Green project report (pdf - 64745.986 KB)
- 5S.01B_Sewer plan (pdf - 8158.757 KB)
- 5S.02B_White water network plan (pdf - 8498.371 KB)
- 5S.03B_Aqueduct plan (pdf - 8271.677 KB)
- 5S.04B_Electricity network plan (pdf - 8819.842 KB)
- 5S.05B_Telecommunications network (pdf - 8261.091 KB)
- 5S.06B_District heating network (pdf - 7348.92 KB)
- 5S.07B_Public lighting (pdf - 8316.308 KB)
- 5S.08B_Synoptic plan of underground services (pdf - 9006.049 KB)
- 5S.09_Road sections (pdf - 6432.366 KB)
- 5S.11_Subservices report (pdf - 1923.167 KB)
- 5V.01_Road project plan (pdf - 4091.984 KB)
- 5V.08_Road project report (pdf - 24972.746 KB)
- 6_Town planning technical report (pdf - 69492.461 KB)
Environmental Report and attachments
- 9.02.B_Non-technical summary (pdf - 4831.484 KB)
- 9.02C_All.E_Form V.INC.A (pdf - 500.612 KB)
- 9.03_Preliminary study hydraulic invariance (pdf - 1860.283 KB)
- 9.04_Acoustic report (pdf - 13825.932 KB)
- 9.05_Traffic study (pdf - 67804.347 KB)
- 9.07_Energy analysis (pdf - 3028.645 KB)
- 9.07B_Art. 10 PGT (pdf - 958.25 KB)
- 9_Environmental Report (pdf - 31847.598 KB)
Published on: 13/05/2022