General report and introductory documents

General Report (Chapters 1 to 5) |Attachments nos. 1, 2, and 5 to 10

The municipalities draw up and approve the Service Plan in order to ensure a global supply of areas for public facilities and of public and general interest, any areas for public residential construction and green equipment, the ecological corridors and green connection system between rural territory and built-up territory, as well as between road works and urbanized areas and their rational distribution on the municipal territory to support the settlement and planned functions.

(general contents of art. 9 of Regional Law 12/2005 and subsequent amendments)

In Service Plan (PdS) of the PGT the documents reporting the principles and goals on which the Plan and the methodologies adopted for the analyses.

In the Attachments The following documents are published at the bottom of the page:

  • General Report (Chapters 1 to 5)
  • Attachment no. 1 - Introduction to the attachments
  • Attachment no. 2 - The service matrix
  • Attachment no. 5 - Documentation relating to the request for services
  • Attachment no. 6 - The statistical method of the Service Plan
  • Attachment no. 7 - The summary statistical tables of the services analyzed
  • Attachment no. 8 - Dictionary of concepts and themes
  • Attachment no. 9 - The bibliography/sitography
  • Attachment no. 10 - The case studies

This documentation contains any changes required by the City Council Resolution no. 35 of 13/03/2017, which became effective with the publication in the BURL  Series  Notices and Competitions n. 24 of 14/06/2017, and previous provisions.

Updated: 20/03/2020