PA ex DE NORA - Via Dei Canzi, Via Crespi, Via San Faustino - Attachments to the resolution approving the G.C. n.2098_2017 of 24.11.2017

PA ex DE NORA - Via Dei Canzi, Via Crespi, Via San Faustino - Attachments to the resolution approving the G.C. n.2098_2017 of 24.11.2017

On display at the Albo Praetorio from 6 December 2017 to 21 December 2017

THE MUNICIPALITY OF MILAN
URBAN PLANNING MANAGEMENT
PLANNING AREA
IMPLEMENTATION AND STRATEGIC URBAN PLANNING

OBJECT

Approval of the “EX DE NORA” Implementation Plan concerning the areas delimited to the north by via Crespi, to the east by via dei Canzi, to the south by via San Faustino and to the west by a residential system parallel to the railway yard.

**************

Documentation attached to the Municipal Council Resolution no. 2098/2017 of 24/11/2017

Resolution of adoption of the Municipal Council and related annexes
Territorial Framework
  • 1 - Territorial Framework (zip - 12599.272 KB)
    TAV 1.1.1 PGT extracts - Transformation areas - TAV 1.1.2 PGT extracts - Strategic project - TAV 1.1.3 PGT extracts - Homogeneous territorial areas - Constraints for soil protection - TAV 1.1.4 PGT extracts - Protection and protection constraints safeguard - Risks and obstacles for air navigation - TAV 1.1.5 Extracts PGT - Public services - Green system, mobility and ERS - The structure of the "Public City - TAV 1.1.6 Service system - TAV 1.1.8 Extracts PGT - Morphological indications and attribution of landscape sensitivity - TAV 1.1.9 PGT extracts - Hydrographic network; Accessibility to networks; Landscape sensitivity - TAV 1.1.10 PGT extracts - TERRITORIAL FRAMEWORK - NIL SHEETS - LAMBRATE n. 23
The structure of the public city
State of fact
  • 3 - State of affairs (zip - 11919.964 KB)
    TAV 2.1.1 Extract from cadastral map - Identification of properties. Areas of direct relevance - TAV 2.2.1 Morphological relationships with the context - Profiles - TAV 2.3.1 Survey - TAV 2.4.1 Photographic documentation - TAV 2.4.2 Photographic documentation. Area A - Demolitions - TAV 2.4.3 Photographic documentation. Area A - End of reclamation - TAV 2.5.1 Demonstration of existing SLP. Building permits for building - TAV 2.5.2 Demonstration of existing SLP. Existing SLP demonstration – analytical calculations
Planivolumetric project
  • 4 - Planivolumetric project (part one) (zip - 26963.127 KB)
    TAV 3.1.1 Volumetric plan inserted in the urban context - TAV 3.1.2 Relationships between public spaces and spaces for public use - TAV 3.1.3 Volumetric plan - TAV 3.1.4 Ground floor – project data for building - TAV 3.1.5 Ground floor and General Landscape Project - TAV 3.2.1 Zoning - Legal regime of the soil - TAV 3.2.1a Zoning - Analytical demonstration of areas under transfer - TAV 3.2.1b Zoning - Analytical demonstration of served areas. Coverage Ratio - TAV 3.2.1c Zoning - Analytical demonstration of filtering areas - TAV 3.2.2 Subsoil occupation areas. Filtering areas. - TAV 3.2.3 Prescriptive Elements - TAV 3.2.4 Implementation phases. Identification of UMI - Timetable - TAV 3.3.1 General Profiles - TAV 3.3.1a Verification of art. 86 of the RE - TAV 3.3.2 Indicative sections of volumetric flexibility - TAV 3.4.1 Volumetric examples. Rendering - TAV 3.4.2 Volumetric Examples. Rendering - TAV 3.5.1 Housing offer. Floor plans. GFA per floor and residential category. Example - TAV 3.5.1a Housing offer - quantitative data - TAV 3.5.2 Housing offer - Profiles - GFA by floor and residential categories - Examples
  • 5 - Planivolumetric project (second part) (zip - 4000 KB)
    TAV 3.1.1 Volumetric plan inserted in the urban context - TAV 3.1.2 Relationships between public spaces and spaces for public use - TAV 3.1.3 Volumetric plan - TAV 3.1.4 Ground floor – project data for building - TAV 3.1.5 Ground floor and General Landscape Project - TAV 3.2.1 Zoning - Legal regime of the soil - TAV 3.2.1a Zoning - Analytical demonstration of areas under transfer - TAV 3.2.1b Zoning - Analytical demonstration of served areas. Coverage Ratio - TAV 3.2.1c Zoning - Analytical demonstration of filtering areas - TAV 3.2.2 Subsoil occupation areas. Filtering areas. - TAV 3.2.3 Prescriptive Elements - TAV 3.2.4 Implementation phases. Identification of UMI - Timetable - TAV 3.3.1 General Profiles - TAV 3.3.1a Verification of art. 86 of the RE - TAV 3.3.2 Indicative sections of volumetric flexibility - TAV 3.4.1 Volumetric examples. Rendering - TAV 3.4.2 Volumetric Examples. Rendering - TAV 3.5.1 Housing offer. Floor plans. GFA per floor and residential category. Example - TAV 3.5.1a Housing offer - quantitative data - TAV 3.5.2 Housing offer - Profiles - GFA by floor and residential categories - Examples
Exemplification
Secondary Urbanizations - Landscape Project
  • Secondary Urbanizations - Landscape Project (first part) (zip - 21013.853 KB)
    TAV 4.1.1 General landscape project - TAV 4.1.2 Typical east-west section - TAV 4.2.1 Public lighting network - TAV 4.2.2 Public lighting network: details - TAV 4.3.1 Rainwater and drainage network Green Sector - TAV 4.3.2 .4.4.1 Rainwater network Infrastructure Sector - TAV 4.4.2 Water network and irrigation - TAV 4.5.1 Water network and irrigation: details - TAV 4.5.2 Green sector flooring abacus - TAV 4.5.3 Green sector furniture abacus - TAV 4.5.4 Game abacus Green Sector - TAV 4.5.5 Paving and curbs Infrastructure Sector - TAV 4.5.6 Paving and furniture abacus Infrastructure Sector - TAV 4.6 Signage - TAV 4.7 Soil, lawns and mulch - TAV 4.9.1 Trees and shrubs - TAV 4.9.2 Technical report on Green Sector works - TAV 4.9.3 Technical report on Irrigation - TAV 4.9.4 Technical report on Infrastructure Sector works - TAV 4.9.5 Technical report on Public lighting - TAV 4.9.6 Lighting calculation - TAV 4.10.1 Technical report on Signage - TAV 4.10.2 .4.10.3 Estimated metric calculation for Green Sector works - TAV 4.10.4 Estimated metric calculation for Irrigation - TAV 4.10.5 Estimated metric calculation for Infrastructure Sector works - TAV 4.10.6 Estimated metric calculation for Public Lighting - TAV 4.10.7 Estimated metric calculation for Signage - TAV XNUMX .XNUMX List of New Prices - TAV XNUMX Summary Estimated metric calculation
  • Secondary Urbanizations - Landscape Project (second part) (zip - 27760.448 KB)
    TAV 4.1.1 General landscape project - TAV 4.1.2 Typical east-west section - TAV 4.2.1 Public lighting network - TAV 4.2.2 Public lighting network: details - TAV 4.3.1 Rainwater and drainage network Green Sector - TAV 4.3.2 .4.4.1 Rainwater network Infrastructure Sector - TAV 4.4.2 Water network and irrigation - TAV 4.5.1 Water network and irrigation: details - TAV 4.5.2 Green sector flooring abacus - TAV 4.5.3 Green sector furniture abacus - TAV 4.5.4 Game abacus Green Sector - TAV 4.5.5 Paving and curbs Infrastructure Sector - TAV 4.5.6 Paving and furniture abacus Infrastructure Sector - TAV 4.6 Signage - TAV 4.7 Soil, lawns and mulch - TAV 4.9.1 Trees and shrubs - TAV 4.9.2 Technical report on Green Sector works - TAV 4.9.3 Technical report on Irrigation - TAV 4.9.4 Technical report on Infrastructure Sector works - TAV 4.9.5 Technical report on Public lighting - TAV 4.9.6 Lighting calculation - TAV 4.10.1 Technical report on Signage - TAV 4.10.2 .4.10.3 Estimated metric calculation for Green Sector works - TAV 4.10.4 Estimated metric calculation for Irrigation - TAV 4.10.5 Estimated metric calculation for Infrastructure Sector works - TAV 4.10.6 Estimated metric calculation for Public Lighting - TAV 4.10.7 Estimated metric calculation for Signage - TAV XNUMX .XNUMX List of New Prices - TAV XNUMX Summary Estimated metric calculation
Primary Urbanizations
  • 9 - Primary Urbanizations (zip - 54577.356 KB)
    TAV 5.1.1 Current state - Access and travel directions - TAV 5.1.2 Current state - existing underground services - TAV 5.2.1 Road project - TAV 5.2.2 Road project - Implementation phases - TAV 5.2.3 Road project - Details - TAV 5.2.4 Road project - Metric calculation - TAV 5.3.1 Public lighting project - TAV 5.3.2 Public lighting project - Details - TAV 5.3.3 Public lighting project - specialist technical report - TAV 5.3.4 Public lighting project - lighting project - TAV 5.3.5 Public lighting project - metric calculation - TAV 5.4.1 Road signage project - TAV 5.4.2 Road signage project - metric calculation - TAV 5.5.1 New underground services project - TAV 5.5.2 New underground services project - Details - TAV 5.5.3 Project for new underground services - aqueduct - TAV 5.5.4 Project for new underground services - aqueduct details - TAV 5.5.5 Project for new underground services - metric calculation - TAV 5.6 Road comparison plan - TAV 5.7 Technical report of primary urbanization works - TAV 5.8 Summary General Metric Calculation - TAV 5.9 Plans Comparison PII S. Faustino
Environmental Analysis
Illustrative Reports - Quantitative Data
Draft agreement
ERS
  • 13 - ERS (zip - 11972.472 KB)
    TAV 9.1.1 Area A. S.Ilario Property - TAV 9.1.2 Conventional buildings for sale of an ordinary type – Area A – (DCC 42/2010) - TAV 9.2.1 Area B. Aroned Property
Economic report
  • 14 - Economic report (zip - 14118.788 KB)
    TAV 10.1.1 Area A - Summary table of charges/works for minimum intervention units. Financial plan quantitative data PA - TAV 10.1.2 Area B - Summary table of charges/works for minimum intervention units. Financial plan quantitative data PA - TAV 10.1.3 Areas under service - Project - TAV 10.1.4 Areas under service - Metric calculation - TAV 10.1.5 Evaluation of demolition and reclamation costs for the Aroned property and amounts of sureties

Published on: 06/12/2017