Macconago - Integrated Intervention Program

The project, of great strategic environmental importance, is part of the areas of peri-urban transformation included within the areas of the Southern Agricultural Park. More generally, the proposal envisages the recovery of a historic rural settlement whose productive function has ceased in over the most recent years. The urban plan is, therefore, aimed at avoiding the complete degradation of a building, typical of the Lombardy plain, through the reconversion of the entire complex to residential purposes and other uses compatible with it.

The intervention will also allow the current Via Macconago to be redeveloped with the aim of contributing to better serving the nearby facilities of public or general interest. 

The project includes: 

  • recovery interventions of existing buildings for residential purposes and construction of new buildings (residence and compatible functions);
  • redevelopment interventions of open spaces through the creation of areas intended for public use (squares, equipped green areas, etc.);
  • recovery and restoration interventions of the Church of San Carlo (17th century) to be used for public services or of general public interest; 
  • redevelopment interventions on existing roads through widening of the road section, planting of new trees, sidewalks on both sides, revision of public lighting, creation of parking areas, etc.

  • 13/05/2022 – approval of the Integrated Intervention Program (DGC n. 700/2022)
  • 10/01/2022 – letter of opinion of exclusion of the Verification of Cultural Interest by the Ministry of Culture (Prot. n. 10/01/2022.0011268.E)
  • 11/09/2020 – adoption of the Integrated Intervention Program (DGC n. 976/2020)
  • 03/03/2020 - Publication of DD n. 1665/2020 relating to the provision of non-subject to SEA
  • 07/12/2019 - Publication of the "Preliminary Report" as part of the verification of eligibility for SEA
  • 12/09/2019 - Examination of the project by the "Municipal Landscape Commission"
  • 22/07/2019 - Inter-area meeting illustrating the urban planning project
  • 16/07/2019 - Examination of the project by the "Intersectoral Committee for Transport and Mobility"
  • 02/07/2019 - Start of the procedure for verifying eligibility for SEA
  • 18/06/2019 - Subsequent update drawn up by another property (PG 269102/2019)
  • 12/01/2018 - Interruption of the investigation deadlines pursuant to art. 14.1 – LR n. 12/05 and subsequent amendments (PG 17097/2018)
  • 12/12/2017 - Request for continuation of the preliminary investigation process signed by the new Ownership (PG 569442/2017)
  • 13/11/2014 - Initial application signed by the "Bankruptcy Trustee" (PG 690605/2014)

  • architectural: the buildings will be designed with particular attention to the rural context;
  • environmental sustainability: the interventions will be carried out according to high energy efficiency standards.

Gallery

Macconago - Chiesa_01
Macconago - Aerial photo_01
Macconago - Aerial photo_02
Macconago - Impact 01
Macconago - Plan_02
Macconago - Piazza_02
Macconago - Impact 03
perimeter

Updated: 14/06/2022