Videos from construction sites

Cycle path redevelopment via Olona - Neighborhood plan

29/04/2024

Redevelopment works are underway on the cycle path of via Olona, ​​via Modestino and via Solari in Municipality 1.

The main interventions: widening of the sidewalk and elimination of architectural barriers with a new flooring in front of the Museum of Science and Technology; tactile paths for the blind; doubling of the sidewalk in front of the Bonaventura Cavalieri professional institute; expansion of the cycle path which will become two-way and connection with the future cycle path of via Carducci De Amicis and via San Vittore; a bus stop in front of the Museum of Science and Technology; 21 new flower beds and tree planting; adaptation of traffic lights and new public lighting system; 18 racks and 5 bicycle racks for a total of 100 places.

The completion of the works is scheduled for October 2024
 

— 20 Elements per Page
Showing 1 - 20 of 97 results.