PII MIND - Milan Innovation District (Expo Area) – Adoption – Resolution by G.C. n. 1654 of 04.10.2019 - Attachments

PII MIND - Milan Innovation District (Expo Area) – Adoption – Resolution by G.C. n. 1654 of 04.10.2019 - Attachments

Published on October 17, 2019

THE MUNICIPALITY OF MILAN
URBAN PLANNING MANAGEMENT

THEMATIC PLANNING AREA AND AREAS ENHANCEMENT

OBJECT

ADOPTION OF THE INTEGRATED INTERVENTION PROGRAM MIND - MILAN INNOVATION DISTRICT - CONCERNING THE AREA USED FOR THE 2015 UNIVERSAL EXHIBITION

- - - - -

Documentation attached to the Municipal Council Resolution no. 1654 dated 04-10-2019 on display in the Praetorian Notice Board.

Attachments
  • PII MIND 1-State of fact (zip - 186097.988 KB)
    TAV 1.01 Territorial framework - TAV 1.02.01 Urban framework (- Expo Program Agreement, - Supplementary Deed to the Expo Program Agreement Supplementary Deed to the Fair Program Agreement - TAV 1.02.02 Urban framework - Territorial Government Plan Municipality of Current Milan - TAV 1.02.02.A Urban framework - Territorial Government Plan Municipality of Milan adopted - TAV 1.02.03 Urban framework - Territorial Government Plan Municipality of Rho (2013) - TAV 1.03 Existing Mobility Framework - TAV 1.04 Planimetry cadastral (2019) - DOC 1.04.A List of maps - TAV 1.05 State of the Intervention Area - TAV 1.06 Constraints, easements and buffer zones - TAV 1.07 Consistencies of the area (building, naturalistic...) - TAV 1.08 Subservices ( with attachments) - DOC 1.A Photographic documentation - TAV 1.A.01 Planimetry of the photographic survey - TAV 1.09.01 General survey of the area - TAV 1.09.02 General survey of the area - TAV 1.09.03 General survey of the area
  • PII MIND 2-Project status (zip - 79384.861 KB)
    DOC 2.A Illustrative Technical Report - TAV 2.01 Project scheme (Planivolumetric) - TAV 2.01.A Project scheme - Characterizing elements - TAV 2.01.B Project scheme - Functional excerpts - TAV 2.01.C Project scheme - Guidelines ( Planivolumetric, typological, formal and construction provisions) - DOC 2.01.A Guidelines sheets - TAV 2.01.D Project scheme - Planivolumetric Scenario - TAV 2.02 Relevant functional excerpts sheets - TAV 2.03 Land regime - Private areas, transfers, easements - TAV 2.04 Equipment due - TAV 2.05 Theme Park - TAV 2.B.01 Project Mobility Framework - TAV 2.B.02 Project road layout and parking system - TAV 2.B.03 Mobility System - TAV 2.C. 01 Project subservices
  • PII MIND 3-Landscape and theme park (zip - 28101.593 KB)
    DOC 3.B Explanatory report Theme Park - DOC 3.C Green - Blue Park - TAV 3.01 Representation of open spaces, parks and squares - TAV 3.03 Example sections
  • PII MIND 4-Primary and secondary urbanization works (zip - 88954.25 KB)
    DOC 4.A - Illustrative report on primary and secondary urbanization works - DOC 4.A.01 - Report estimating the value of the artefacts constituting the Cascina Triulza complex - DOC 4.B - Descriptive report on existing primary and secondary urbanization works - DOC 4.C - Summary economic framework of the values ​​of existing primary and secondary urbanization works - DOC 4.D - Feasibility study of adaptations of existing primary and secondary urbanization works - TAV B.1.2 Adaptation of the East Gate - TAV B .1.4.1 Northern Loop Adaptation - 1 - TAV B.1.4.2 Northern Loop Adaptation - 2 - TAV B.1.4.3 Northern Loop Adaptation - 3 - TAV B.1.5 Roserio Car Park Adaptation - TAV B.1.6 Cargo Reconfiguration 11 - TAV B.1.7 Adaptation of the West Gate - TAV B.1.8 New roundabout in the Bollate Prison area - TAV B.1.10 ALS1 Adaptation of the “South 1” perimeter road system and former temporary Post Office axis - TAV B.1.10 ALS2 Adaptation of the South perimeter road system - Southern section of the ALS2 - TAV B.1.10 ALS3(A) Adaptation of the SOUTH perimeter road network - Southern section ALS3A - TAV B.1.10 ALS3(B) Adaptation of the SOUTH perimeter road network - Southern section ALS3B - TAV B.4.1 Adaptation of the MIR Mind walkway - Fiera (Ex PEF) Section B - TAV B.4.2 Adaptation of the MIC MIND-Cascina Merlata (ex PEM) walkway - TAV B.4.3 Connection Rho-Mind-Sport Park - Leisure - TAV B.4.5 Adaptation of western access to the underground level access to the RFI station - TAV B.4.7 Redevelopment of the canalside route - TAV B.4.8 New Food and Health Park - TAV B.4.9 New Sports and Entertainment Park - TAV B.4.10 Works related to the MIND-Stephenson railway stop Accessibility works for the new station - TAV B 4.11 Interventions to enhance accessibility and mobility in Rho - DOC 4.D.01 Economic overview of the values ​​of the adaptation works of the primary and secondary OOUU - TAV 4.01 Existing primary and secondary urbanization works - TAV 4.02 Adaptations of the urbanization works existing primary and secondary urbanization - TAV 4.03 Phasing of the transfers of urbanization works
  • PII MIND 5-Rel economic (zip - 16076.594 KB)
    DOC 5.A Summary economic framework - DOC 5.B Time program of the Works
  • PII MIND 6-Regulations and convention (zip - 36774.892 KB)
    DOC 6.A Technical Implementation Standards - TAV 6.A.01 Functional Excerpt Project Model - TAV 6.A.02 Survey Table Model - TAV 6.A.03 Survey Table Model - Indicators - DOC 6.B Agreement scheme
  • List of papers and program summary (zip - 11302.111 KB)
  • PII MIND - VAS-Annexes 1-8 (zip - 264328.513 KB)
    Environmental Report - Non-Technical Summary - Annex 1 – Current programmatic tools - Annex 2 – Resilience: proposal of indicators - Annex 3 – Documentation of predictive evaluation of acoustic climate and study of the necessary mitigation systems - Annex 4 – Mobility Plan - Annex 5 – Energy strategy - Annex 6 – Verification and adaptation of service infrastructure works – hydraulic invariance - Annex 7 – Landscape report - Annex 8 - Atmospheric modeling study and related tables
  • VAS_annexes 9-12 and others (zip - 200860.773 KB)
    Attachment 9 - Study of territorial potential - Attachment 10 - Study of connections with the context - Attachment 11 - Diagram of the temporal phases of the development project - Attachment 12 - Health risk assessment for vapors coming from the groundwater and data - Table 3 - Constraints , easements and buffer zones - Table 4 – Location of drinking water wells around the Site - Table 5 – Location of companies at risk of a major accident (RIR), contaminated sites and unhealthy industries - Reasoned Opinion (Managerial Resolution no. 172 of 17 May 2019 ) - Summary Statement (30 September 2019)

Published on: 17/10/2019