IMPLEMENTATION PLAN FOR FARINI SPECIAL AREA, FARINI-VALTELLINA UNIT - NOTICE OF MADE AVAILABLE OF THE PROPOSAL FOR IMPLEMENTATION PLAN, OF THE ENVIRONMENTAL REPORT AND OF THE NON-TECHNICAL SUMMARY IN THE CONTEXT OF THE STRATEGIC ENVIRONMENTAL ASSESSMENT PROCEDURE (SEA)

IMPLEMENTATION PLAN "FARINI SPECIAL ZONE, FARINI-VALTELLINA UNIT" - NOTICE OF MADE AVAILABLE OF THE PROPOSAL FOR THE IMPLEMENTATION PLAN, THE ENVIRONMENTAL REPORT AND THE NON-TECHNICAL SUMMARY IN THE CONTEXT OF THE STRATEGIC ENVIRONMENTAL ASSESSMENT PROCEDURE (SEA)

Seen:

  • the art. 4 of Regional Law n. 12 of 11 March 2005 'Law for the governance of the territory';
  • the art. 14, of legislative decree n. 152 of 3 April 2006 'Regulations on environmental matters';
  • the general guidelines for environmental assessment (SEA) approved with decree 351 of 13 March 2007, and the further regulatory requirements approved by the Regional Council with resolution no. 761 of 10 November 2010;

Given that:

  • it was necessary to renew the provision of the Environmental Report, Non-Technical Summary and the documentation constituting the proposed Implementation Plan (as per the list), as the duplicates of the attachments to the Environmental Report published improperly were eliminated;
  • the elimination of these annexes does not affect the completeness of the Environmental Report as the updated version of the same is already contained in the appendix in the document itself;
  • therefore the publication period of complete and unchanged documentation, as per the list below starts again from 15.11.2023 and remains in consultation for the due period. It is therefore recommended not to consider the attachments to the RA already published individually, but to consider only those included in the appendix of the PDF of the Environmental Report.

This specified, it is known that

  • the following documentation is available to the public from 15 November 2023 until 29 December 2023:

ENVIRONMENTAL REPORT AND ATTACHMENTS

  • Environmental Report
  • Non-technical summary

IMPLEMENTATION PLAN DOCUMENTS
1 - Territorial framework

  • 1.1 PGT extracts (PDR): R01/1 Geological feasibility - R02/2 Urban planning indications - R03/2 Morphological indications - All.01 Landscape sensitivity
  • 1.2 PGT extracts (PDR): R05 Administrative constraints - R06 Protection and safeguard constraints - R08 Obstacles and dangers for air navigation - R09/2 Hydrographic network
  • 1.3 PGT extracts (PDS): S01/2 Public services - S02/2 Green and mobility system - S03 Ecological network - D04 Landscape map
  • 1.4 a Summary of constraints
  • 1.4 b Railway buffer zone
  • 1.5 Framework of the area and greenery system
  • 1.6 Hydrogeological framework
  • 1.7 Location of geotechnical and seismic characterization investigations
  • 1.8 Framework plan of the areas affected by urbanization works
  • 1.9 Area regulations - Excerpt from the current AdP - attachments H1 - B1 - DVS and attachment J of the current PGT (Plan document)
  • 1.10 PGT extracts: NIL 78 Flours

2 - State of affairs

  • 2.1 a Orthophotogrammetric overview of the area
  • 2.1 b Orthophotogrammetric overview of the area
  • 2.2 Extract from cadastral map - Identification of properties.
  • 2.3 a Certified plano-altimetric survey of the area - CSGI - Eng. Andrea Montagna
  • 2.3 b Identification of the Territorial Surface pursuant to art. 5.1 of the NdA of the PdR on a sworn plano-altimetric survey
  • 2.4 PA Perimeter - Overlay of reference bases (CTC - cadastral map)
  • 2.5 a Photographic documentation of the urban context
  • 2.5 b Photographic documentation inside the Piano area
  • 2.6 Current status - Altimetric profiles of existing buildings extended to the context

3 – Planivolumetric project

  • 3.1 Project - Competition masterplan Farini special area
  • 3.2.1 Project - Volumetric plan inserted in the urban context
  • 3.2.2 Project - Planivolumetric
  • 3.2.3 Project - Legal regime of the land
  • 3.3 Project - Indicative, prescriptive elements and intervention methods
  • 3.4 Project - Altimetric profiles extended to the context
  • 3.5 Project - Appurtenant underground parking scheme
  • 3.6 Project - Identification of Project Coordination Units and Minimum Intervention Units
  • 3.7 Project - Intervention Phases

4 – Primary urbanization works, public service equipment and/or public interest

  • 4.1a Preliminary project - Primary urbanizations - General project plan and plan excerpts
  • 4.1b Preliminary project - Primary urbanizations - General project plan and plan excerpts
  • 4.2a Preliminary project - Primary urbanizations - Comparison plan between the actual state and the project
  • 4.2b Preliminary project - Primary urbanizations - Comparison plan between the actual state and the project
  • 4.4 Preliminary project - Primary urbanizations - Project road sections
  • 4.5 Preliminary project - Primary urbanizations - Comparison road sections

5- Documents

  • 5.1 Illustrative technical report
  • 5.1.1 Landscape report
  • 5.7 Geological compatibility assessment to support the definitive proposal of the "Farini Unità Valtellina Special Area" Implementation Plan

6- Public service equipment

  • 6.2.1 General landscape plan of the areas being sold
  • 6.2.6 Preliminary design of passing structure
  • 6.5.1 Rainwater disposal system - Technical report
  • 6.5.2 Rainwater disposal system - Planimetry

7- Equipment of public interest

  • 7.2.1 General landscape plan of the served areas
  • 7.5.1 Rainwater disposal system in served areas and connection to the main sewerage network - Technical report
  • 7.5.2 Rainwater disposal system in served areas - Planimetry

the same documentation is published on the regional SIVAS website and, in paper version, is deposited at the following locations:

  • Municipal offices of the Implementation Planning Area 1 - via Sile, 8 - 7th floor - 'Proceeding Authority' with the following opening hours: Monday to Friday from 10.00 to 12.00 and from 14.30 to 16.00;
  • Municipal offices of the Water Resources and Environmental Hygiene Area – via Sile- 8 – 3rd floor – 'Competent Authority' with the following opening hours: Monday to Friday from 10.00 to 12.00 and from 14.30 to 16.00.

Anyone who has an interest, pursuant to art. 14 paragraph 2, of Legislative Decree 152/06 and subsequent amendments, also for the protection of widespread interests, may view the documentation made available and present observations and proposals in written form, also providing new or additional cognitive and evaluative elements, presenting them by the 29 December 2023 to the following email addresses:

  • planningurbanisticattuativastrategica@postacert.comune.milano.it;
  • urb.atpa1@comune.milano.it.

The Area Director
Arch. Sara Augusta Morlacchi
“Proceeding Authority”

SIVAS
ENVIRONMENTAL REPORT AND ATTACHMENTS
IMPLEMENTATION PLAN DOCUMENTS - 1 Territorial framework
IMPLEMENTATION PLAN DOCUMENTS - State of affairs
IMPLEMENTATION PLAN DOCUMENTS - Planivolumetric project
IMPLEMENTATION PLAN DOCUMENTS - Primary urbanization works, public service equipment and/or public interest
IMPLEMENTATION PLAN DOCUMENTS - Documents
IMPLEMENTATION PLAN DOCUMENTS - Public service equipment
IMPLEMENTATION PLAN DOCUMENTS - Equipment of public interest

Published on: 08/11/2023