PGT Adopted - Milan 2030

A NEW STEP TOWARDS #MILAN2030
The Territorial Government Plan for Milan 2030 has been adopted

The City Council approved the Milan 2030 PGT in the meeting of 14/10/2019.

The new Territorial Government Plan will become effective with the publication of the notice of approval definitive version of the Plan in the Official Bulletin of the Lombardy Region (BURL), which will take place following the drafting of the documents modified by the acceptance of observations, opinions and amendments.

Until that date, the provisions continue to apply safeguard measures following the adoption of the Plan, operational starting from 05/03/2019.

Main changes made to the Plan through amendments

Addition of Abbiategrasso among the strategic squares and Bonola among the interchange nodes to be redeveloped, the new denomination of some of the 88 districts of the city - which also marks the official recognition of "Nolo" together with Loreto and Casoretto -, reduction of times, from three to two years, for a decommissioned property to be considered abandoned, the removal of the Via Novara area from the municipal areas to be put up for tender for the construction of a place of worship, the confirmation of Piazza d'Armi as a future example of urban forestation .

Allocation to other municipalities of at least 50% of the proceeds relating to urbanization charges and monetizations deriving from urban planning interventions in Municipality 1, the obligation for operators to start works of public interest before private interventions, the ban on outdoor activities wholesale in the Ancient Formation Nuclei such as via Sarpi, the objective of planting two trees for every new parking space created, the need to hold competitions or similar instruments for the regeneration projects of the squares and interchange nodes with subsequent monitoring of the effects of 'intervention.

Possibility of creating large sales structures in the areas intended to host large urban functions of San Siro-Trotto, Porto di Mare and Ronchetto, in order to guarantee the financial sustainability of the GFU themselves.

Increase in the share of social residential housing in interventions of over 10.000 m0,40 of surface area, providing for an index of 0,35 m0,20/m0,20 (compared to 0,05 of the current PGT) divided into at least XNUMX mXNUMX/mXNUMX per rental, at most XNUMX mXNUMX/mXNUMX for sale and obligation of XNUMX for public residential construction in the presence of public financing.


We inform you that the SAFEGUARD MEASURES will be operational starting from 5 March 2019, the date of the adoption resolution.

Attached below are the documents of the ADOPTED PGT as amended by the City Council upon adoption.


We invite you to follow the official communication channels (News and Newsletter, Social).

1. A connected, metropolitan and global city
Urban planning will be strongly connected to the development of mobility infrastructures, which in the coming years will see the construction of the M4, the extension of the metro towards Monza and Settimo Milanese, the adaptation of the railway belt according to the Circle Line and the strengthening of the railway service Regional and high speed. According to an urban growth logic that wants the greatest possible number of people to live and work a short distance from a train or metro stop also to reduce dependence on private mobility, the Plan encourages regeneration interventions near 13 interchange nodes – Comasina, Bovisa, Stephenson, Cascina Gobba, Centrale, Garibaldi, San Donato, Rogoredo, Famagosta, Bisceglie, Lampugnano, Molino Dorino, Bonola – determining in correspondence with them the possibility of exceeding the maximum building index of 1 m0,7/mXNUMX foreseen in highly accessible areas of the city (the maximum index in the less accessible areas is instead set at XNUMX mXNUMX/mXNUMX) also through the creation of Social Residential Housing.

2. A city of opportunities, attractive and inclusive
The Plan identifies 6 areas - San Siro-Trotto, Bovisa-Goccia, Piazza D'Armi, Ronchetto, Porto di Mare and Rubattino - whose development will be linked to the establishment of "Large Urban Functions", such as hospitals, sports facilities, parks urban areas, administrative headquarters, large-scale projects that bring new services to the metropolitan area. It is also expected to assimilate the change of intended use between the production, tertiary, hospitality and private services categories, in order to encourage the creation of job opportunities for young people, in particular linked to the 4.0 economy. As regards the housing issue, given the growing demand of the young population, the Plan encourages the construction of rental homes, allowing private individuals to exceed the maximum buildability index in accessible areas of the city through the construction of social housing for rent, for sale of subsidized type and co-housing and reducing the request for provision of services for free building interventions, provided that a rent quota is foreseen, with the aim of increasing the offer and therefore controlling prices.

3. A green, livable and resilient city
The new Plan provides for a reduction in land consumption by 4% compared to the current Plan, to be achieved through the restriction of over 3 million m1,5 of areas to agricultural use, the expansion of the southern park by approximately 20 million m7, the creation of the large Metropolitan Park through the ecological connection between the North park and the South park, the creation of at least XNUMX new parks including the XNUMX planned within the railway yards and a forestation plan under study which provides for an increase notable number of trees in the metropolitan area.
As far as buildings are concerned, the required standards will be raised, with the improvement of energy performance, the creation of new permeable areas, including through "green roofs", and the certification of CO2 reduction.

4. One city, 88 neighborhoods to call by name
The plan aims to enhance its 88 neighborhoods by placing its squares at the centre, improving public space and services for citizens and overcoming the territorial and social gap between center and periphery. The heart of this strategy are the projects for the reopening of the Navigli, the redevelopment of the railway yards and the regeneration of 7 squares characterized by high accessibility located on the 90/91 axis; Loreto, Maciachini, Lotto, Romolo, Abbiategrasso, Trento and Corvetto can be regenerated with interventions that improve their design quality, pedestrian usability and attractiveness. Even in these areas characterized by wide accessibility it will be possible to exceed the maximum building index (1 m0,7/mXNUMX instead of XNUMX mXNUMX/mXNUMX) through the creation of Social Residential Building.

5. A city that regenerates itself
Redevelop the existing so as not to consume further public land. The Plan identifies some "Urban Regeneration Areas", areas on the edge of the territory which will have to be enhanced with interventions aimed at recovering the degraded building heritage. Furthermore, the recovery of 3 thousand public housing units is envisaged, the creation of some social rent housing within the framework of the Program Agreement on the Railway Yards, the experimentation in 10 public areas of public housing and housing services within contexts mixed social groups. Finally, severe measures are envisaged regarding abandoned buildings, providing for the loss of existing volumetric rights and the assignment only of the single building index for those who leave buildings in a state of decay.

Environmental Report
ALL_B_VAS - Environmental Report 

Environmental Report: Annex 1 Reference planning framework
ALL_B1_VAS - Environmental Report - Annex 1

Environmental Report: Annex 2 Territorial and environmental reference framework
ALL_B2_VAS - Environmental Report - Annex 2 

Non-Technical Summary
ALL_C_VAS_Non-Technical Summary 

Reasoned opinion
ALL_D_VAS_Reasoned_Opinion 

Reasoned Opinion: Attachment 1 – Investigation Report
ALL_D1_VAS_Motivated_Opinion_ALL1_Report 

Reasoned opinion: Attachment 2 – Conference minutes
ALL_D2_VAS_Parere_Motivato_ALL2_VerbaliConf 

Reasoned Opinion: Attachment 3 – Observations/Contributions
ALL_D3_VAS_Opinion_Motivated_ALL3_Contributions 

Summary Statement
ALL_E_VAS_Dichiarazione_di_Sintesi 

Declaration of adequacy of the geological component
ALL_F_Component_Compatibility_Declaration 

Municipal opinion 1
ALL_G_Municipio1_Del18_24.07.2018 

Municipal opinion 2
ALL_H_Municipio2_Del39_26.07.2018 

Municipal opinion 3
ALL_I_Municipio3_Del24_25.07.2018 

Municipal opinion 4
ALL_L_Municipio4_Del26_25.07.2018 

Municipal opinion 5
ALL_M_Municipio5_Del23_26.07.2018 

Municipal opinion 6
ALL_N_Municipio6_Del32_30.07.2018 

Municipal opinion 7
ALL_O_Municipio7_Del21_24.07.2018 

Municipal opinion 8
ALL_P_Municipio8_Del32_18.07.2018 

Municipal opinion 9
ALL_Q_Municipio9_Del44_26.07.2018 

General Report: Milan 2030 – Vision, Construction, Strategies, Spaces
01DP_General_Report 

Implementation rules
02DP_Regulations_Implementation 

Table D.01 Draft Plan; scale 1:30.000
03DP_D01_Draft_plan 

Table D.02 Map of the landscape; scale 1:20.000
04DP_D02_Landscape_map 

Annex 1: Landscape Contents of the Plan, Municipal Ecological Network and Urban Green and Open Space System
05DP_DA1_Paesaggistici_REC 

Implementation rules and Catalog of public services and of public or general interest
01PS_Norms_Implementation_Catalogue 

Local Identity Units (Cards, List of services from the Catalogue)
02PS_NIL List of services
02PS_NIL_List_Services 
02PS_NIL sheets from 01 to 15
02PS_NIL_Schede_01_15 
02PS_NIL sheets from 16 to 30
​► 02PS_NIL_Schede_16_30 
02PS_NIL sheets from 31 to 44
​► 02PS_NIL_Schede_31_44 
02PS_Shede of NILs from 45 to 60
02PS_NIL_Schede_45_60 
02PS_Shede of NILs from 61 to 75
02PS_NIL_Schede_61_75 
02PS_Shede of NILs from 76 to 88
02PS_NIL_Schede_76_88 

Table S.01 Public Services and of public or general interest; scale 1:10.000 
03PS_S01/1_Servizi_sistenza_1_NO
03PS_S01_Municipal_public_services_1_NO 
03PS_S01/2_Servizi_sistenza_2_NE
03PS_S01_Servizi_pubblici_comunali_2_NE 
03PS_S01/3_Servizi_sistenza_3_SE
03PS_S01_Servizi_pubblici_comunali_3_SE 
03PS_S01/4_Servizi_sistenza_4_SO
03PS_S01_Servizi_pubblici_comunali_4_SO 

Table S.02 The urban greenery and mobility infrastructure system; scale 1:10.000
04PS_S02/1_Sistema_verde_mobilità_1_NO
04PS_S02_Sistema_verde_mobilita_stradale_1_NO 
04PS_S02/2_Sistema_verde_mobilità_2_NE
04PS_S02_Sistema_verde-mobilita_stradale_2_NE 
04PS_S02/3_Sistema_verde_mobilità_3_SE
04PS_S02_Sistema_verde-mobilita_stradale_3_SE 
04PS_S02/4_Sistema_verde_mobilità_4_SO
04PS_S02_Sistema_verde-mobilita_stradale_4_SO 

Table S.03 Ecological network and system of urban greenery and open spaces; scale 1:20.000
05PS_S03_Ecological_network 

Implementation rules
01PR_Regulations_Implementation 

Table R.01 Feasibility and geological, hydrogeological and seismic requirements; scale 1:20.000
02PR_R01_Geological_Feasibility 

Table R.02 Urban planning indications; scale 1:10.000 
03PR_R02/1_Urbanistic_Indications_1_NO
03PR_R02_Indicazioni_urbanistice_1_N-O 
03PR_R02/2_Indicazioni_Urbanistic_2_NE
03PR_R02_Indicazioni_urbanistice_2_N-E 
03PR_R02/3_Indicazioni_Urbanistic_3_SE
03PR_R02_Indicazioni_urbanistice_3_S-E 
03PR_R02/4_Indicazioni_Urbanistic_4_SO
03PR_R02_Indicazioni_urbanistice_4_S-O 

Table R.03 Morphological indications; scale 1:10.000 
04PR_R03/1_Indicazioni_Morfologica_1_NO
04PR_R03_Indicazioni_morphologica_1_N-O 
04PR_R03/2_Indicazioni_Morfologica_2_NE
04PR_R03_Indicazioni_morphologica_2_N-E 
04PR_R03/3_Indicazioni_Morfologica_3_SE
04PR_R03_Indicazioni_morphologica_3_S-E 
04PR_R03/4_Indicazioni_Morfologica_4_SO
04PR_R03_Indicazioni_morphologica_4_S-O 

Table R.04 Nuclei of ancient formation - Analysis of historical-morphological values; scale 1:2.000 
05PR_R04/1_NAF Historic centre_Analysis_1
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_1 
05PR_R04/2_NAF Historic centre_Analysis_2
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_2 
05PR_R04/3_NAF Historic centre_Analysis_3
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_3 
05PR_R04/4_NAF Historic centre_Analysis_4
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_4 
05PR_R04/5_NAF Historic centre_Analysis_5
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_5 
05PR_R04/6_NAF Historic centre_Analysis_6
05PR_R04_NAF-CS_Analisi_valori_storico-morphologico_6 
05PR_R04/7_NAF External nuclei_Analysis_7
05PR_R04_NAF-CS_7_16_Analysis of morphological historical values 
05PR_R04/8_NAF External nuclei_Analysis_8
05PR_R04_NAF-CS_17_25_Morphological_historical_values_analysis 

Table R.05 Administrative and soil protection constraints; scale 1:20.000
06PR_R05_Administrative_constraints 

Table R.06 Protection and safeguard constraints; scale 1:20.000
07PR_R06_Vincoli_tutela 

Table R.07 Risks, noise and Radar for air navigation; scale 1:20.000
08PR_R07_Airport_restrictions_part_I 

Table R.08 Obstacles and Dangers for air navigation; scale 1:20.000
09PR_R08_Airport_restrictions_Part_II 

Table R.09 Hydrographic Network - buffer zones and flood risk management plan (PGRA); scale 1:10.000 
10PR_R09/1_Reticolo_idrografico_PGRA_1_NO
10PR_R09_Reticolo_Idrico_PGRA_1_N-O 
10PR_R09/2_Reticolo_idrografico_PGRA_2_NE
10PR_R09_Reticolo_Idrico_PGRA_2_N-E 
10PR_R09/3_Reticolo_idrografico_PGRA_3_SE
10PR_R09_Reticolo_Idrico_PGRA_3_S-E 
10PR_R09/4_Reticolo_idrografico_PGRA_4_SO
10PR_R09_Reticolo_Idrico_PGRA_4_S-O 

Table R.10 Land Consumption Map; scale 1:20.000
11PR_R10_Carta_Consumo_Soil 

Annex 1: Map of the landscape sensitivity of the places; scale 1:20.000
12PR_RA01_Giudizio_sintetico_paesaggio 

Annex 2: Regulations on hydraulic police
13PR_R_A2_Regulation_Hydraulic Police 

Annex 3: Technical document for companies at risk of a major accident
14PR_A3_ERIR 

Annex 4: Explanatory report and guidelines relating to obstacles and dangers for air navigation and technical information - Methodology for estimating airport noise level assessment (LVA) curves
15PR_RA4_Relazione_Incoli_aeroportuali_part_III 

Report and implementing rules
01PAR_Relation_Regulations_Implementation

Table PAR.01 Existing and forecast religious equipment; scale 1:20.000
02PAR_Religious_Equipment_Plan 

Mediagallery

01_MG_objective
02_MG_objective
03_MG_objective
04_MG_objective
05_MG_objective

Updated: 20/03/2020